TY - JOUR AU - Haase, Matthias PY - 2022/12/21 Y2 - 2024/03/28 TI - A case study of implementing a renovation concept JF - Acta Polytechnica CTU Proceedings JA - APP VL - 38 IS - SE - Innovative Technologies and Systems DO - 10.14311/APP.2022.38.0382 UR - https://ojs.cvut.cz/ojs/index.php/APP/article/view/8313 SP - 382-388 AB - <p><span dir="ltr" style="left: 24.08%; top: 22.53%; font-size: calc(var(--scale-factor)*9.96px); font-family: sans-serif; transform: scaleX(1.04054);" role="presentation">There is an untapped potential for reducing GHG emissions by district renovation. It </span><span dir="ltr" style="left: 14.11%; top: 23.95%; font-size: calc(var(--scale-factor)*9.96px); font-family: sans-serif; transform: scaleX(1.01867);" role="presentation">needs a detailed Energy Master Planning (EMP) of the district and support for the decision-making </span><span dir="ltr" style="left: 14.11%; top: 25.37%; font-size: calc(var(--scale-factor)*9.96px); font-family: sans-serif; transform: scaleX(1.02871);" role="presentation">processes. If applied in a comprehensive manner it can contribute significantly to reducing energy </span><span dir="ltr" style="left: 14.11%; top: 26.79%; font-size: calc(var(--scale-factor)*9.96px); font-family: sans-serif; transform: scaleX(0.988792);" role="presentation">consumption and thus to a long-term sustainable development of districts and climate neutrality in our </span><span dir="ltr" style="left: 14.11%; top: 28.21%; font-size: calc(var(--scale-factor)*9.96px); font-family: sans-serif; transform: scaleX(0.98053);" role="presentation">cities.</span><br role="presentation" /><span dir="ltr" style="left: 17.65%; top: 29.63%; font-size: calc(var(--scale-factor)*9.96px); font-family: sans-serif; transform: scaleX(1.03577);" role="presentation">The EMP typically includes combinations of energy supply and consumption, but it is equally </span><span dir="ltr" style="left: 14.11%; top: 31.05%; font-size: calc(var(--scale-factor)*9.96px); font-family: sans-serif; transform: scaleX(1.03494);" role="presentation">important to understand the different solutions for district renovation. The multi-owner structure in </span><span dir="ltr" style="left: 14.11%; top: 32.47%; font-size: calc(var(--scale-factor)*9.96px); font-family: sans-serif; transform: scaleX(0.963714);" role="presentation">many districts requires another set of solution finding that is embedded in potential analysis, stakeholder </span><span dir="ltr" style="left: 14.11%; top: 33.89%; font-size: calc(var(--scale-factor)*9.96px); font-family: sans-serif; transform: scaleX(1.00466);" role="presentation">analysis, participative planning, and multi-actor-Management. A district near Winterthur, Switzerland </span><span dir="ltr" style="left: 14.05%; top: 35.31%; font-size: calc(var(--scale-factor)*9.96px); font-family: sans-serif; transform: scaleX(0.954779);" role="presentation">was used as a case study. Site visits and structured interviews with key stakeholders were used to collect </span><span dir="ltr" style="left: 14.11%; top: 36.73%; font-size: calc(var(--scale-factor)*9.96px); font-family: sans-serif; transform: scaleX(0.985925);" role="presentation">data which was then used to model the technical-economic situation and to determine the possibilities </span><span dir="ltr" style="left: 14.11%; top: 38.15%; font-size: calc(var(--scale-factor)*9.96px); font-family: sans-serif; transform: scaleX(1.03744);" role="presentation">for the future.</span></p> ER -