[1]
Hohberg, J.-M. 2019. 3D FEM ANALYSIS OF THE CONSTRUCTION PIT FOR A TBM-DRIVEN FLOOD DISCHARGE GALLERY. Acta Polytechnica CTU Proceedings. 23, (Jul. 2019), 31–37. DOI:https://doi.org/10.14311/APP.2019.23.0031.