Sellitto, M. A. (2018) “LEAD-TIME, INVENTORY, AND SAFETY STOCK CALCULATION IN JOB-SHOP MANUFACTURING”, Acta Polytechnica, 58(6), pp. 395–401. doi: 10.14311/AP.2018.58.0395.