“STUDY ON ARRANGEMENT OF COOLING WATER PIPE TO CONTROL HYDRATION HEAT OF CONCRETE IN BEAM OF CABLE-STAYED BRIDGE” (2021)
Stavební obzor - Civil Engineering Journal
, 30(2). doi:
10.14311/CEJ.2021.02.0039
.