ON OPERATION OF 740 M LONG FREIGHT TRAINS ON CZECH TEN-T RAILWAY NETWORK

Authors

  • Michal Drábek Department of Logistics and Management of transport, Faculty of Transportation Sciences, CTU in Prague, Czech Republic
  • Vít Janoš Department of Logistics and Management of Transport, Faculty of Transportation Sciences, CTU in Prague, Czech Republic
  • Zdeněk Michl Department of Logistics and Management of Transport, Faculty of Transportation Sciences, CTU in Prague, Czech Republic

DOI:

https://doi.org/10.14311/APP.2016.5.0012

Abstract

Regulation (EU) No 1315/2013 defines actual scope of core and comprehensive TEN-T network, including both networks for railway freight transport. For the core network, possibility to operate 740 m long freight trains is required. The aim of this paper is to analyse availability of appropriate overtaking tracks for 740 m long freight trains. Due to ETCS braking curves and odometry, such trains, after ETCS implementation, will require 780-800 m long overtaking tracks. For practical reasons (e.g. bypass lines), whole Czech railway TEN-T network is analysed. The overtaking track, whose occupation means influence on scheduled traffic or threat to boarding passengers, are excluded. The data was collected from station schemes from Collection of Official Requisites for 2015/16 Timetable, issued by SŽDC, Czech state Infrastructure Manager. Most of appropriate tracks are over 800 m long, but their density in the network and in particular directions varies considerably. For freight traffic, gradient of the line is important, so in the resulting figure, there are marked significant peaks for particular lines as well. Czech TEN-T lines are further segmented on the basis of number of tracks and their traffic character. Then, specific issues on overtaking or crossing of 740 m long freight trains are discussed. As a conclusion, for long-term development of Czech TEN-T lines, targeted investment is recommended not only for passenger railway, but also for freight railway. An attractive capacity offer for railway undertakings, which can stimulate freight traffic on European Rail freight corridors, can be represented by network-bound periodic freight train paths with suitable long overtaking tracks outside bottlenecks. After the overtaking by passenger trains, a freight train should run without stop through large node station or a bottleneck area. Before the sections with high gradients, coupling of additional locomotives should be connected with the overtaking process. Next suitable overtaking tracks should be available behind every significant peak of the line.

Downloads

Download data is not yet available.

Downloads

Published

2016-09-15

How to Cite

Drábek, M., Janoš, V., & Michl, Z. (2016). ON OPERATION OF 740 M LONG FREIGHT TRAINS ON CZECH TEN-T RAILWAY NETWORK. Acta Polytechnica CTU Proceedings, 5, 12–16. https://doi.org/10.14311/APP.2016.5.0012