INFLUENCE OF NEW CONSTRUCTION PROJECTS ON VINOHRADY TUNNELS

Authors

  • Jiří Barták Czech Technical University in Prague, Faculty of Civil Engineering, Depatment of Geotechnics, Thákurova 7, 166 29 Prague, Czech Republic

DOI:

https://doi.org/10.14311/APP.2022.32.0001

Keywords:

cracks, deformations, influence on tunnel lining, new buildings, Vinohrady tunnels

Abstract

After demolition of the brutalist architectural style Transgas building in Vinohradská Street, Prague, (all buildings of which were located above the historic Vinohrady tunnels II and III), there will be built the Vinohradská Administration Centre with the addition of a building No. 345 called "Above the Museum". Both buildings have the foundation joint immediately above the lining of the existing tunnels. This paper describes the main phases of construction and the character and size of the deformation affecting the stone block lining of the tunnels.

Downloads

Download data is not yet available.

Downloads

Published

2022-01-19

How to Cite

INFLUENCE OF NEW CONSTRUCTION PROJECTS ON VINOHRADY TUNNELS. (2022). Acta Polytechnica CTU Proceedings, 32, 1-6. https://doi.org/10.14311/APP.2022.32.0001