THE BÍLINA TUNNEL – SELECTED GEOTECHNICAL ASPECTS OF A PROPOSED UNDERGROUND STRUCTURE

Authors

  • Viktor Sotorník INSET s.r.o., Divize energetika, Lucemburská 1170/7, 130 00 Praha 3 – Vinohrady, Czech Republic
  • Petr Černoch ČEZ Energetické produkty, s.r.o., Komenského 534, 253 01 Hostivice, Czech Republic
  • Jiří Košťál Czech Technical University in Prague, Faculty of Civil Engineering, Depatment of Geotechnics, Thákurova 2077/7, 166 29 Prague, Czech Republic

DOI:

https://doi.org/10.14311/APP.2022.32.0021%20

Keywords:

aquifer test, CISS, geotechnical investigation, pressure meter test, tunnel

Abstract

Every workday the city of Bílina, with the I/13 road running through it, suffers from traffic congestion. The road is designed as dual carriageway outside Bílina but only as a single carriageway inside the city. Three roundabouts further complicate the situation. As a solution a 1,3 km long tunnel going under the city was proposed. The preliminary geotechnical investigation describes the geological conditions of the area, suggests the most appropriate localisation details of the tunnel, points out several complications that can be expected and finally offers solutions to mitigate them.

Downloads

Download data is not yet available.

Downloads

Published

2022-01-19

How to Cite

THE BÍLINA TUNNEL – SELECTED GEOTECHNICAL ASPECTS OF A PROPOSED UNDERGROUND STRUCTURE. (2022). Acta Polytechnica CTU Proceedings, 32, 21-24. https://doi.org/10.14311/APP.2022.32.0021