Smart Power Generation & Storage TEDOM

Authors

  • Tomáš Bičák TEDOM a.s.,
  • Helena Kolomazníková TEDOM a.s.

DOI:

https://doi.org/10.14311/TEE.2018.2.042

Abstract

The contribution describes the project implemented in the production plant of TEDOM. It defines the part of the premises where the buildings are supplied with electric power from the photovoltaic power plant in collaboration with a CHP unit. A battery system is employed to compensate for the imbalances between the power generation and consumption. Yet the buildings are completely independent of the connection to the distribution network. Thus, it is a so-called "off-grid" operation.