On-site Partial Discharges Measurement of XLPE Cables
Abstract
The contribution deals with the methodology ofon-line measurement of partial discharges in XLPE cables.
After the specification of measuring methodology and used
apparatus the evaluation of the measured data follows.
Contribution gives an example of a real on-site
measurement on 110kV XLPE cable power line in
operation.
References
Seltzer-Grant, M., Renfort, L., Mackinlay, R., Denisov, D.,
Madarasz, R., Schlapp, H., Petzold, F.; “Portable Online PD
spot Testing and Monitoring Technology for Distribution Class
Cables” 2011. ELEKTROENERGETIKA.
http://www.hvpd.co.uk/products/sensors. [Online] 20. 4 2012.