A geotechnical investigation for an office building in the foothills of the Bohemian Forest
DOI:
https://doi.org/10.14311/APP.2026.56.0029Keywords:
geotechnical investigation, military training area, geophysical study, soil stabilizationAbstract
An office building with a partial basement on an undeveloped plot within Polná na Šumave was proposed. The municipality is located on the border of Boletice Military Training Area which had some specific security measures that had to be respected during the investigation. The detailed geotechnical investigation describes the geological conditions of the area, points out several complications that can be expected and finally proposes solutions to mitigate them.
Downloads
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Viktor Sotorník, Petr Černoch

This work is licensed under a Creative Commons Attribution 4.0 International License.
