Optimisation and Just-in-Time

Authors

  • V. Beran

DOI:

https://doi.org/10.14311/338

Keywords:

Just-in-Time approach, production speeds, production volumes, optimisation savings, dependent capacity expansion, risk of extra costs

Abstract

Arranging production activities to fit in with other construction activities is one of the basic ideas of the Just-in-Time approach. In the construction industry it has never been very fully applied. This is a mistake [1]. Construction works, particularly expensive parts of them, are a field where the approach can be and should be applied.

Downloads

Download data is not yet available.

Author Biography

V. Beran

Downloads

Published

2002-01-02

How to Cite

Beran, V. (2002). Optimisation and Just-in-Time. Acta Polytechnica, 42(2). https://doi.org/10.14311/338