POST-TENSIONING THE CONNECTION REGION OF PRECAST POST-TENSIONED BRIDGE GIRDERS FOR CONTINUITY

Authors

  • Mutaz M. M. Taha Northeast Forestry University (NEFU), College of Civil Engineering, Harbin, China
  • Yanmin Jia

DOI:

https://doi.org/10.14311/CEJ.2018.01.0004

Keywords:

Bridge, Precast, Post-tension, Continuous girder, Finite-element analysis

Abstract

In the study, a precast post-tension concrete girder was tested to examine the behavior of the structure before and after continuity and to evaluate the effectiveness of post-tensioning for continuity to resist positive and negative moments in the connection region. The initial stresses were measured in a concrete bridge constructed using simple support precast post-tension girders that achieved continuity by strengthening the girders through post-tensioning the top of the girders at the connection region. The initial stresses were calculated before and after continuity to examine the effects of continuity on prestress levels. The stresses were calculated at the continuity diaphragm to investigate the effect of post-tensioning on continuity moments. A 3D finite-element model was developed via ANSYS to simulate the performance of the precast post-tension concrete girders. In order to achieve continuity, five forms were compared, and the results indicate that post-tensioning for continuity leads to an increase in the compression stress on the sections. The mid-span stress–strain curve results also show that an increase in the load-carrying capacity for models achieves continuity through post-tensioning. The method used to achieve continuity as described throughout the study presented a stiffer response when compared to that of the other forms of continuity.

Downloads

Download data is not yet available.

References

Kaar, Paul H, Kriz, Ladislav Bohumer and Hognestad, Eivind, 1960. Precast-prestressed concrete bridges: 1. Pilot tests of continuous girders. Portland Cement Association, Research and Development Laboratories, pp. 2 1-37.

Mattock, Alan H and Kaar, Paul H, 1960. Precast-Prestressed Concrete Bridges: 3. Further Tests of Continuous Girders. Portland Cement Association, Research and Development Laboratories, pp. 5 1-78.

Thippeswamy, Hemanth K, GangaRao, Hota VS and Franco, Jason M, 2002. Performance evaluation of jointless bridges. Journal of Bridge Engineering, vol. 7: 276-289.

El-Safty, Adel and Okeil, Ayman M., 2008. Extending the service life of bridges using continuous decks. PCI Journal, vol. 53: 96-111.

Miller, Richard A, Castrodale, R, Mirmiran, A and Hastak, M, 2004. Connection of simple-span precast concrete girders for continuity. NCHRP Report 519, Transportation Research Board of the National Academies, p. 202.

Hastak, Makarand, Mirmiran, Amir, Miller, Richard, Shah, Ronak and Castrodale, Reid, 2003. State of practice for positive moment connections in prestressed concrete girders made continuous. Journal of Bridge Engineering, vol. 8: 267-272.

Mirmiran, Amir, Kulkarni, Siddharth, Castrodale, Reid, Miller, Richard and Hastak, Makarand, 2001. Nonlinear continuity analysis of precast, prestressed concrete girders with cast-in-place decks and diaphragms. PCI Journal, vol. 46: 60–80.

Hossain, Tanvir, Okeil, Ayman M. and Cai, C. S., 2014. Field test and finite-element modeling of a three-span continuous-girder bridge. Journal of Performance of Constructed Facilities, vol. 28: 136-148.

Eamon, Christopher D., Chehab, Alaa and Parra-Montesinos, Gustavo, 2016. Field Tests of Two Prestressed-Concrete Girder Bridges for Live-Load Distribution and Moment Continuity. Journal of Bridge Engineering, vol. 21: p.04015086.

Ma, Zhongguo, Huo, Xiaoming, Tadros, Maher K and Baishya, Mantu, 1998. Restraint moments in precast/prestressed concrete continuous bridges. PCI journal, vol. 43: 40-57.

Tadros, Maher K, Ficenec, Joseph A, Einea, Amin and Holdsworth, Steve, 1993. A new technique to create continuity in prestressed concrete members. PCI Journal, vol. 38: 30-37.

Sousa, Carlos, Fonseca, Marco, Calcada, Rui and Neves, Afonso Serra, 2013. New methodology for calculation of required prestressing levels in continuous precast bridge decks. Journal of Bridge Engineering, vol. 18: 1219-1226.

Du, J. S., Au, Francis T. K., Chan, Enoch K. H. and Liu, L., 2016. Deflection of unbonded partially prestressed concrete continuous beams. Engineering Structures, vol. 118: 89-96.

Tan, Kiang Hwee, 2014. Beam strengthening by external post-tensioning: Design recommendations. The IES Journal Part A: Civil & Structural Engineering, vol. 7: 219-228.

Tan, Kiang Hwee and Tjandra, Robert A., 2003. Strengthening of precast concrete girder bridges by post-tensioning for continuity. PCI Journal, vol. 48: 56-71.

James K. Wight, James G. MacGregor, 2011. Reinforced Concrete_ Mechanics and Design (Prentice Hall) 71 pp.

Martin, Leslie D Perry, Christopher J, 2004. PCI design handbook: Precast and prestressed concrete, chapter 11 (Prestressed Concrete Inst) 32 pp.

Downloads

Published

2018-04-30

How to Cite

Taha, M. M. M., & Jia, Y. (2018). POST-TENSIONING THE CONNECTION REGION OF PRECAST POST-TENSIONED BRIDGE GIRDERS FOR CONTINUITY. Stavební Obzor - Civil Engineering Journal, 27(1). https://doi.org/10.14311/CEJ.2018.01.0004

Issue

Section

Articles