Construction Technology and Application of TBM in Shengli Tunnel of Tianshan Mountain under poor geological conditions

Authors

  • Zhenping Zhao Southeast University
  • Chen Jianxun
  • Geng Qi
  • Li Dong
  • Huang Dengxia
  • Luo Yanbin
  • Liu Weiwei
  • Mu Shaoping
  • Peter Anesu Kanhenga
  • Wu Teligen

DOI:

https://doi.org/10.14311/CEJ.2024.02.0012

Keywords:

TBM, Poor geology, geological forecasting, tunnel face pre-reinforcement, advanced pipe shed method

Abstract

            When a tunnel boring machine (TBM) excavates in poor geological conditions like fracture zones, soft rock with high ground stress, hard rock with high ground stress, and water inrush ground, severe problems such as surrounding rock collapse, convergence, rock burst and water and mud outburst are usually encountered. These problems existed in the Tianshan Shengli Tunnel project in Xinjiang, China. Several methods and techniques were adopted to reduce construction risks and improve construction efficiency. The seismic wave reflection long-distance geological forecasting method was employed to forecast and predict these adverse geological conditions. The pre-reinforcement construction method was employed on the surrounding broken rocks in front of the tunnel face to lower the risks of tunnel collapse and machine jamming. A combined steel arch was applied to prevent tunnel arch collapse. An artificial cap method was applied to prevent the jamming caused by high-ground stress soft rock. Measures such as spraying water on the tunnel face and drilling stress holes were employed to prevent rock bursts caused by high-ground stress in hard rock. Implementing the advanced pipe shed method during water influx, sudden mud, and other working conditions reduced the risk of groundwater damage to equipment and lowered risks to personnel safety. The successful application of these techniques can provide a reference for TBM tunnel construction in similar ground conditions.

Downloads

Download data is not yet available.

References

. Xu P., Huang J., Zhou J.B., et al., 2020. 3D Numerical simulation of the interaction between rock mass and shield TBM passing through the fault fracture zone. Modern Tunnelling Technology, vol. 57(06): 63-69.

. Zhang J.M., Shi K.B., DALAYIHAN Bahetebieke et al., 2023. Evaluation and prediction of TBM′s geological adaptability based on variable-weight set pair-multidimensional linked normal cloud model. Tunnel Construction, vol. 43(04): 645-657.

. Xie, W., et al., 2023. Fast perception of rock mass strength and integrity in TBM tunnelling using in-situ penetration test. Tunnelling and Underground Space Technology, vol. 141.

. Cheng S.L., Wang L.C., Hu H.Q., et al., 2023. Fault and fracture zone collapse treatment technology for open tunnel boring machine applied in beijiang water diversion project. Tunnel Construction, vol. 43(12): 2122-2132.

. Yang J.H., Sheng K., Zhou J., et al., 2023. Mechanism and prevention of tunnel collapse through water-rich fault fracture zone. Journal of Engineering Geology, vol. 31(01): 248-257.

. Longlong, C., et al., 2023. Characteristics and treatment measures of tunnel collapse in fault fracture zone during rainfall: A case study. Engineering Failure Analysis, vol. 145.

. Tong R.J., Zheng S.T., Wu Y.J., et al., 2022. Key technology of advance pre-grouting of ground directional holesto shield roadway passing fault and broken zone. Coal Science and Technology, vol. 50(06): 196-203.

. Chen P., Ma X.Q., Long J., et al., 2022. Method of designing pipe roof support parameters for tunnel in fault zone. Journal of Yangtze River Scientific Research Institute, vol. 39(12): 62-67.

. Ma D., Sun Y., Wang W.X., et al., 2021. Key technologies for controlling large deformation of soft rock tunnels with high geostress. Tunnel Construction, vol. 41(10): 1634-1643.

. Liu Y.P., Xia C.C., Wu F.B., et al., 2020. A combined support technology of long and short bolts of soft rock tunnels under high ground stresses. Chinese Journal of Rock Mechanics and Engineering, vol. 39(01): 105-114.

. Wang W.P., Li J.F., Yan P.B., et al., 2023. Design practice of prestressed anchor cable support technology for soft rock with extremely high geostress and large deformation in muzhailing tunnel. Tunnel Construction, vol. 43(S1): 313-322.

. Zheng Y., Guo P., Wang L.J., et al., 2023. Key technologies for treating high ground stress and large deformation of soft rock in daliangshan tunnel of Yunlin expressway. Tunnel Construction.

. Han C.L., Xu C., Xia C.C., et al., 2023. Design of reserved deformation for soft rock tunnels with high geostress. Tunnel Construction, vol. 43(11): 1916-1923.

. Zhang, Q., et al., 2023. Microseismic characteristic and development mechanism of fault-slip rockburst in a deep-buried TBM excavated tunnel: A case study. Tunnelling and Underground Space Technology, vol. 142.

. Li, P., et al., 2023. Rockburst and microseismic activity in a lagging tunnel as the spacing between twin TBM excavated tunnels changes: A case from the Neelum-Jhelum hydropower project. Tunnelling and Underground Space Technology, vol. 132.

. Wang K., 2021. Overview of state-of-art of rockburst prediction and prevention techniques for deep-buried tunnels. Tunnel Construction, vol. 41(02): 212-224.

. He, S., et al., 2021. Damage behaviors, prediction methods and prevention methods of rockburst in 13 deep traffic tunnels in China. Engineering Failure Analysis, vol. 121.

. Li, Z., et al., 2022. Research on the difficulties and countermeasures of TBM tunnel construction in plateau railway. Journal of Railway Engineering Society, vol. 39(9): 70-78.

. Fu, K., et al., 2023. Karst hydrogeological characteristics and construction disease analysis of a high-speed railway tunnel. Journal of Railway Engineering Society, vol. 40(10): 86-92.

. Shi, Z., et al., 2023. Failure mechanism analysis for tunnel construction crossing the water-rich dense fracture zones: A case study. Engineering Failure Analysis, vol. 149.

. Liu, N., et al., 2022. Geological investigation and treatment measures against water inrush hazard in karst tunnels: A case study in Guiyang, southwest China. Tunnelling and Underground Space Technology, vol. 124.

. Lang Z.J., Li M.Y., Qiao H.Y., 2023. Key technologies for treating large-scale water and mud inrush in inclined shaft work area of super-long tunnels. Modern Tunnelling Technology, vol. 60(05): 224-233.

Downloads

Published

2024-07-30

Issue

Section

Articles

How to Cite

Construction Technology and Application of TBM in Shengli Tunnel of Tianshan Mountain under poor geological conditions. (2024). Stavební Obzor - Civil Engineering Journal, 33(2), 168-180. https://doi.org/10.14311/CEJ.2024.02.0012